Project Alternatives

Click on the icons below to view information about the project alternatives

Viable Alternatives

Build Alternative 1F-6'

Aerial image of proposed Alt 1F-6'

Simulated View Post-Construction 1 - Looking east on State Route 128 west of the bridge

Visual Simulation of Alt 1F-6'

Simulated View Post-Construction 2 - Looking east at State Route 128 from west of the bridge 

Visual Simulation of Alt 1F-6'

Build Alternative 3F-6'

Aerial image of proposed Alt 3F-6'

Simulated View Post-Construction 1 - Looking east on State Route 128 west of the bridge

Visual simulation of Alt 3F-6'

Simulated View Post-Construction 2 - Looking east at State Route 128 from east of the bridge

Visual Simulation of Alt 3F-6'

No Build

Under the No-Build Alternative, Caltrans would not replace the bridge or the culvert. The bridge would continue to deteriorate and operate without shoulders and with substandard lane widths. This alternative would not meet the purpose and need of the Project.  

Alternatives Considered but Eliminated from Further Consideration*

 

*Please view the Draft Environmental Document for more information

Alternative 1T:

Accelerated Bridge Construction with Temporary Bridge

Alternative 2T:

Conventional Bridge Construction with Temporary Bridge

Alternative 2F:

Conventional Bridge Construction with Full Closure

Alternative 3T-6':

6-Foot Shoulders  with Temporary Bridge

Alternative 3F-4':

4-Foot Shoulders  with Full Closure

Alternative 1S: Accelerated Bridge Construction with Single-Lane Closure 

A

Alternative 2S:

Conventional Bridge Construction with Temporary Bridge

Alternative 3T-4':

 4-Foot Shoulders with Temporary Bridge

Alternative 3T-8':

8-Foot Shoulders  with Temporary Bridge

Alternative 3F-8':

8-Foot Shoulders  with Full Closure

Alternative 4:

Retrofit Existing Bridge